CEN 307 — NORTH CHANNEL (LAC HURON), PREMIÈRE ÉDITION, 2000


Chapter 6 — Paragraph 191, after “with a depth of”

Delete: 0.8 m
Replace by: 0.7 m

(C2014-003.01)
(Monthly Edition No. 3/14)


Chapter 6 — Paragraph 194, last line

Add: A submarine pipeline follows the channel of Desbarats River to a point SE of Davy Island and Walker Island thence WSW to Kensington Point.

(C2014-003.02)
(Monthly Edition No. 3/14)


Chapter 6 — Paragraph 196, after “by tall weeds.”

Delete: “There is a gravel ramp … in poor condition (1999).”

(C2014-003.03)
(Monthly Edition No. 3/14)


Chapter 6 — Delete paragraph 200.

(C2014-011.01)
(Monthly Edition No. 7/14)


Chapter 6 — Paragraph 238

Delete: Overhead power cables with a least clearance of 9.7 m
Replace by: Submarine power cables

(C2014-003.04)
(Monthly Edition No. 3/14)